Nearby Bridges in NBI 2021: 9


I-5 (Hwy 1) NB over Santiam River (Route: 5)
Num:17318 001 24066x
Open: no restriction [A]
Built: 1995, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 262.1 m = 860.0 ft
Main Spans: 4 at 73.2 m = 240.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (3 Lanes) and Out-To-Out: 19.1 m = 62.7 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
065 MI N OF ALBANY NCL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 30.1 metric ton = 33.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 23.3 metric ton = 25.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) SB over Santiam River (Route: 5)
Num:08123D001 24066x
Open: no restriction [A]
Built: 1991, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 262.1 m = 860.0 ft
Main Spans: 4 at 73.2 m = 240.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (2 Lanes) and Out-To-Out: 19.1 m = 62.7 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
065 MI N OF ALBANY NCL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 88.9 metric ton = 97.8 tons (Load Factor(LF) [1])
Inventory: 20.9 metric ton = 23.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) NB over Santiam Overflow No. 4 (Route: 5)
Num:17342 001 24042x
Open: no restriction [A]
Built: 1994, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 51.8 m = 170.0 ft
Main Spans: 4 at 13.1 m = 43.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18.3 m = 60.0 ft (3 Lanes) and Out-To-Out: 19.1 m = 62.7 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Linn County [043], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
6.2 MI N OF ALBANY
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 76.2 metric ton = 83.8 tons (Load Factor(LF) [1])
Inventory: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) SB over Santiam Overflow No. 4 (Route: 5)
Num:08124 001 24042x
Open: no restriction [A]
Built: 1958, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 51.8 m = 170.0 ft
Main Spans: 5 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 19.3 m = 63.3 ft (2 Lanes) and Out-To-Out: 20.5 m = 67.3 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Linn County [043], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
06.2 MI N OF ALBANY NCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) Conn over Santiam Overflow No. 3 (Route: 5)
Num:17191 001 24112x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 42.7 m = 140.1 ft
Main Spans: 3 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (2 Lanes) and Out-To-Out: 15.4 m = 50.5 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
1/2 N OF SANTIAM RIVER
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 1300 (2018) and Trucks: 18%
Future ADT: 2200 (In 2030 )
I-5 (Hwy 1) NB over Santiam Overflow No. 3 (Route: 5)
Num:17352 001 24112x
Open: no restriction [A]
Built: 1994, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 32.9 m = 107.9 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 25.6 m = 84.0 ft (3 Lanes) and Out-To-Out: 26.4 m = 86.6 ft for a 25.6 m = 84.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
6.9 MI N OF ALBANY NCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 66.2 metric ton = 72.8 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) SB over Santiam Overflow No. 3 (Route: 5)
Num:08122 001 24112x
Open: no restriction [A]
Built: 1958, Reconstructed: 1991
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 32.9 m = 107.9 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 25 m = 82.0 ft (3 Lanes) and Out-To-Out: 25.8 m = 84.6 ft for a 25 m = 82.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
069 MI N OF ALBANY NCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 48.1 metric ton = 52.9 tons (Load Factor(LF) [1])
Inventory: 29 metric ton = 31.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) NB over Santiam Overflow No. 5 (Route: 5)
Num:18352 001 24020x
Open: no restriction [A]
Built: 2001, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 36 m = 118.1 ft
Main Spans: 3 at 12 m = 39.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.6 m = 41.3 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 12.6 m = 41.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Linn County [043], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
060 MI N OF ALBANY NCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 36 metric ton = 39.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 27.9 metric ton = 30.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )
I-5 (Hwy 1) SB over Santiam Overflow No. 5 (Route: 5)
Num:19220 001 24020x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 35 m = 114.8 ft
Main Spans: 3 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.6 m = 41.3 ft (2 Lanes) and Out-To-Out: 13.5 m = 44.3 ft for a 12.6 m = 41.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Linn County [043], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
060MI N OF ALBANY NCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 83.6 metric ton = 92.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 64.5 metric ton = 71.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 34250 (2018) and Trucks: 18%
Future ADT: 36300 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider