HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


USH B12-MADISON ST over CHIPPEWA RIVER 10 (Route: 0)
Num:B18009100000000x
Open: no restriction [A]
Built: 1924, Reconstructed: 1977
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 191.6 m = 628.6 ft
Main Spans: 5 at 43 m = 141.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 20.1 m = 65.9 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Eau Claire [22300]: Eau Claire County [035], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 6
3.6M E JCT USH 12
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.9 metric ton = 59.3 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 24616 (2018) and Trucks: 0%
Future ADT: 27077 (In 2039 )
LRD BARSTOW ST over EAU CLAIRE RIVER (Route: 0)
Num:B18011000000000x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 54.3 m = 178.2 ft
Main Spans: 2 at 26.6 m = 87.3 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Eau Claire [22300]: Eau Claire County [035], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.1M N JCT USH B12
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.2 metric ton = 77.2 tons (Load Factor(LF) [1])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8473 (2018) and Trucks: 0%
Future ADT: 9320 (In 2039 )
USH B12-FARWELL ST over EAU CLAIRE RIVER (Route: 12)
Num:B18010900000000x
Open: no restriction [A]
Built: 1985, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 66.8 m = 219.2 ft
Main Spans: 3 at 25.3 m = 83.0 ft
Approach Spans: 0
Skew: 11
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 18.9 m = 62.0 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Eau Claire [22300]: Eau Claire County [035], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 6
4.2M E JCT USH 12
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57 metric ton = 62.7 tons (Load Factor(LF) [1])
Inventory: 34 metric ton = 37.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 9618 (2018) and Trucks: 7%
Future ADT: 10579 (In 2039 )
LRD DEWEY ST over EAU CLAIRE RIVER (Route: 0)
Num:B18009300000000x
Open: no restriction [A]
Built: 1931, Reconstructed: 1979
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 66 m = 216.5 ft
Main Spans: 2 at 32.6 m = 107.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Eau Claire [22300]: Eau Claire County [035], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.1M E JCT USH B12
Condition
Deck: Fair [5]
Superstructure: Serious [3]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 33 metric ton = 36.3 tons ()
Inventory: 19.4 metric ton = 21.3 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2597 (2018) and Trucks: 0%
Future ADT: 2856 (In 2039 )
LRD LAKE ST over CHIPPEWA RIVER 09 (Route: 0)
Num:B18008100000000x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 192.2 m = 630.6 ft
Main Spans: 5 at 41.5 m = 136.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Eau Claire [22300]: Eau Claire County [035], Wisconsin [55]
Owned by State Highway Agency [01], DOT District: 6
0.1M W JCT USH B12
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.5 metric ton = 61.1 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8300 (2018) and Trucks: 0%
Future ADT: 8300 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider