HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 13


SPR 17 over TH 5 WB ON RAMP (Route: 17)
Num:27211x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.1 m = 138.1 ft
Main Spans: 3 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 22
Width, Roadway: 5.5 m = 18.0 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
AT JCT TH 55; 5
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 67.3 metric ton = 74.0 tons (Load Factor(LF) [1])
Inventory: 40.5 metric ton = 44.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 500 (1978) and Trucks: 0%
Future ADT: 500 (In 2029 )
MN 55 over TH 5; WB COLL RD (Route: 55)
Num:27112x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 50.9 m = 167.0 ft
Main Spans: 2 at 28.7 m = 94.2 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 27.6 m = 90.6 ft (6 Lanes) and Out-To-Out: 29.3 m = 96.1 ft for a 28.3 m = 92.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
AT THE JCT TH 5; 55
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 56.7 metric ton = 62.4 tons (Load Factor(LF) [1])
Inventory: 33.9 metric ton = 37.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 78000 (2017) and Trucks: 4%
Future ADT: 78000 (In 2039 )
MN 5 over MISS RIVER; CITY ST (Route: 5)
Num:9300x
Open: no restriction [A]
Built: 1961, Reconstructed: 2016
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 364.2 m = 1194.9 ft
Main Spans: 7 at 91.4 m = 299.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.9 m = 58.7 ft (4 Lanes) and Out-To-Out: 22.3 m = 73.2 ft for a 25.6 m = 84.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 12.5 m = 41.0 ft
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.1 MI SW OF JCT TH 51
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 36.6 metric ton = 40.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 28.2 metric ton = 31.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 58000 (2019) and Trucks: 4%
Future ADT: 54000 (In 2039 )
CON 611 over TH 5 WB RAMP (Route: 611)
Num:27118x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 33.7 m = 110.6 ft
Main Spans: 1 at 32 m = 105.0 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 14.1 m = 46.3 ft (2 Lanes) and Out-To-Out: 15.1 m = 49.5 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
0.1 MI SW OF JCT TH 55
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 99.6 metric ton = 109.6 tons (Load Factor(LF) [1])
Inventory: 62.2 metric ton = 68.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 9000 (1996) and Trucks: 0%
Future ADT: 9000 (In 2029 )
CON 611 over TH 55 (Route: 611)
Num:27107x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 92.8 m = 304.5 ft
Main Spans: 2 at 49.1 m = 161.1 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 12.4 m = 40.7 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
0.1 MI SW OF JCT TH 55
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 75.1 metric ton = 82.6 tons (Load Factor(LF) [1])
Inventory: 44.1 metric ton = 48.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 9000 (1996) and Trucks: 6%
Future ADT: 9000 (In 2029 )
MN 55 over TH 5 EB off ramp (Route: 55)
Num:27108x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 51.8 m = 170.0 ft
Main Spans: 3 at 23.3 m = 76.4 ft
Approach Spans: 0
Skew: 44
Width, Roadway: 12.6 m = 41.3 ft (2 Lanes) and Out-To-Out: 13.6 m = 44.6 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
0.1 MI NW OF JCT TH 5
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 84.9 metric ton = 93.4 tons (Load Factor(LF) [1])
Inventory: 50.6 metric ton = 55.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 39000 (2017) and Trucks: 4%
Future ADT: 39000 (In 2039 )
MN 55 over TH 5 EB OFF RAMP (Route: 55)
Num:27169x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 52.6 m = 172.6 ft
Main Spans: 3 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 11.5 m = 37.7 ft (2 Lanes) and Out-To-Out: 12.7 m = 41.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
AT JCT TH 5; 55
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57 metric ton = 62.7 tons (Load Factor(LF) [1])
Inventory: 34.1 metric ton = 37.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 39000 (2017) and Trucks: 4%
Future ADT: 39000 (In 2039 )
CON 5876 over TH 5 WB ON RAMP (Route: 5876)
Num:27161x
Open: no restriction [A]
Built: 1968, Reconstructed: 2020
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 61.2 m = 200.8 ft
Main Spans: 3 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 48
Width, Roadway: 11.5 m = 37.7 ft (2 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
AT JCT TH 5; 55
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 67.8 metric ton = 74.6 tons (Load Factor(LF) [1])
Inventory: 40.8 metric ton = 44.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11000 (1994) and Trucks: 0%
Future ADT: 12000 (In 2040 )
MSAS 194 over West 7th St TH 5 (Route: 194)
Num:9489x
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 52.6 m = 172.6 ft
Main Spans: 3 at 28.7 m = 94.2 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 11.2 m = 36.7 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
1.9 MI SW OF JCT TH 51
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78.4 metric ton = 86.2 tons (Allowable Stress(AS) [2])
Inventory: 32.7 metric ton = 36.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2900 (2012) and Trucks: 0%
Future ADT: 2900 (In 2039 )
MSAS 194 over West 7th St TH 5 (Route: 194)
Num:9490x
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 52.6 m = 172.6 ft
Main Spans: 3 at 28.7 m = 94.2 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 11.6 m = 38.1 ft (3 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
1.9 MI SW OF JCT TH 51
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.5 metric ton = 95.2 tons (Allowable Stress(AS) [2])
Inventory: 40.8 metric ton = 44.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2900 (2012) and Trucks: 0%
Future ADT: 2900 (In 2039 )
CON 2173 over BLOOMINGTON R (Route: 2173)
Num:9306x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 38.3 m = 125.7 ft
Main Spans: 3 at 12.1 m = 39.7 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 13.7 m = 44.9 ft (3 Lanes) and Out-To-Out: 14.7 m = 48.2 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
0.2 MI NW OF JCT TH 5
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 83.6 metric ton = 92.0 tons (Load Factor(LF) [1])
Inventory: 50 metric ton = 55.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11000 (1994) and Trucks: 0%
Future ADT: 11000 (In 2029 )
MN 55 over Bloomington Rd (Route: 55)
Num:27171x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 37.6 m = 123.4 ft
Main Spans: 3 at 11.9 m = 39.0 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 9.6 m = 31.5 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
0.1 MI NW OF JCT TH 5
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.7 metric ton = 49.2 tons (Load Factor(LF) [1])
Inventory: 26.8 metric ton = 29.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 39000 (2017) and Trucks: 4%
Future ADT: 39000 (In 2039 )
MN 55 over Bloomington Road (Route: 55)
Num:27116x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 37.5 m = 123.0 ft
Main Spans: 3 at 12.1 m = 39.7 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 14.6 m = 47.9 ft (3 Lanes) and Out-To-Out: 15.6 m = 51.2 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Snelling [21965]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
0.2 MI NW OF JCT TH 5
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 53.9 metric ton = 59.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 34500 (2017) and Trucks: 4%
Future ADT: 34500 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider