HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


CSAH 42 over MISS R; MISS BL (Route: 42)
Num:3575x
Open: no restriction [A]
Built: 1927, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 464.4 m = 1523.7 ft
Main Spans: 5 at 99.8 m = 327.4 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 17.1 m = 56.1 ft (4 Lanes) and Out-To-Out: 25.5 m = 83.7 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 15.9 m = 52.2 ft
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by County Highway Agency [02], DOT District: 5
AT W CO LINE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 37.6 metric ton = 41.4 tons (Allowable Stress(AS) [2])
Inventory: 22.5 metric ton = 24.8 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 15800 (2016) and Trucks: 0%
Future ADT: 15800 (In 2039 )
MUN 2074 over RAVINE (Route: 2074)
Num:3575Ax
Open: no restriction [A]
Built: 1927, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 49.1 m = 161.1 ft
Main Spans: 4 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.2 m = 30.2 ft (2 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 5
AT THE JCT FORD PKWY
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 57.6 metric ton = 63.4 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3150 (1978) and Trucks: 0%
Future ADT: 3150 (In 2029 )
CSAH 46 over GODFREY PARKWAY (Route: 46)
Num:27B84x
Open: no restriction [A]
Built: 2017, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 31.6 m = 103.7 ft
Main Spans: 1 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 21.9 m = 71.9 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by County Highway Agency [02], DOT District: 5
0.3 MI W OF COUNTY LINE
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 81.3 metric ton = 89.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 56.1 metric ton = 61.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 15800 (2016) and Trucks: 0%
Future ADT: 15800 (In 2039 )
MUN 1612 over MINNEHAHA CREEK (Route: 1612)
Num:5756x
Open: no restriction [A]
Built: 1908, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Arch - Deck [11]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Closed Grating [4] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 190.3 m = 624.4 ft
Main Spans: 1 at 87.8 m = 288.1 ft
Approach Spans: 8
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by Other State Agencies [21], DOT District: 5
0.1 MI E OF JCT MHAHA A
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 48.6 metric ton = 53.5 tons (Load Factor(LF) [1])
Inventory: 27.8 metric ton = 30.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 200 (1985) and Trucks: 0%
Future ADT: 200 (In 2029 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.