Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 131.4 m = 431.1 ft
Main Spans: 4 at 44.2 m = 145.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Red Cedar [66550]: Dunn County [033], Wisconsin [55]
Owned by County Highway Agency [02], DOT District: 6
1.7M E JCT STH 25
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 34.3 metric ton = 37.7 tons (Load Factor(LF) [1])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 2131 (2018) and Trucks: 0%
Future ADT: 2344 (In 2039
)