BridgeSeek

Nearby Bridges in NBI 2021: 5


MSAS 262 over MISSISSIPPI RIVER; RR (Route: 262)
Num:27549x
Open: no restriction [A]
Built: 1975, Reconstructed: 2010
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 455.7 m = 1495.2 ft
Main Spans: 10 at 77.1 m = 253.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 5
0.2 MI E OF LYNDALE AVE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36 metric ton = 39.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 27.9 metric ton = 30.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 8865 (2017) and Trucks: 0%
Future ADT: 8865 (In 2034 )
CSAH 152 over I 94 (Route: 152)
Num:27819x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 59.6 m = 195.5 ft
Main Spans: 2 at 29 m = 95.1 ft
Approach Spans: 0
Skew: 14
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 23.9 m = 78.4 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.9 MI S OF JCT TH 694
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 74.1 metric ton = 81.5 tons (Load Factor(LF) [1])
Inventory: 44.4 metric ton = 48.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 6007 (2019) and Trucks: 13%
Future ADT: 5900 (In 2039 )
MSAS 169 over I 94 (Route: 169)
Num:27812x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 88.9 m = 291.7 ft
Main Spans: 2 at 33.7 m = 110.6 ft
Approach Spans: 2
Skew: 20
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 21.4 m = 70.2 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
3.4 MI N OF JCT TH 12
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 75.1 metric ton = 82.6 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17002 (2019) and Trucks: 7%
Future ADT: 16700 (In 2039 )
MSAS 262 over I 94 (Route: 262)
Num:27549Ax
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 71.8 m = 235.6 ft
Main Spans: 2 at 42.2 m = 138.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.8 MI S OF JCT TH 694
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63.3 metric ton = 69.6 tons (Load Factor(LF) [1])
Inventory: 37.9 metric ton = 41.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 8900 (2017) and Trucks: 0%
Future ADT: 8900 (In 2039 )
I 94 over Shingle Creek (Route: 94)
Num:27717x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 23.3 m = 76.4 ft
Main Spans: 1 at 21.6 m = 70.9 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 45.4 m = 149.0 ft (8 Lanes) and Out-To-Out: 47.6 m = 156.2 ft for a 43.3 m = 142.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.6 MI S OF JCT TH 694
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81.6 metric ton = 89.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 29.5 metric ton = 32.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 111000 (2019) and Trucks: 4%
Future ADT: 101000 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.