Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 54.9 m = 180.1 ft
Main Spans: 1 at 36.6 m = 120.1 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 4.9 m = 16.1 ft (1 Lanes) and Out-To-Out: 6.2 m = 20.3 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 4.62 m = 15.2 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tillamook County [057], Oregon [41]
Owned by State Highway Agency [01], DOT District: 1
051 MI E HWY 9 JCT
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Inventory: 16.3 metric ton = 17.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 1000 (2018) and Trucks: 14%
Future ADT: 1300 (In 2038
)