Bridge Type
Main Span(s): Prestressed concrete [5] Channel beam [22]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 1 at 12.8 m = 42.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5 m = 16.4 ft (1 Lanes) and Out-To-Out: 5.5 m = 18.0 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
S OF SE FOSTER ROAD
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 192 (2020) and Trucks: 1%
Future ADT: 206 (In 2025
)