HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 20


I-5 (HWY 001) over WILLAMETTE RIVER MARQUAM (Route: 5)
Num:08328 001 30038x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 318.2 m = 1044.0 ft
Main Spans: 3 at 134.1 m = 440.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 33.8 m = 110.9 ft (8 Lanes) and Out-To-Out: 40.8 m = 133.9 ft for a 16.9 m = 55.4 ft approaching roadway.
Vertical Clearance: 4.7 m = 15.4 ft and Navigational Clearance: 21.9 m = 71.9 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
1.1 MI S OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 25.3 metric ton = 27.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.4 metric ton = 21.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 139800 (2018) and Trucks: 9%
Future ADT: 153700 (In 2038 )
Port. Mil Lt Rail over WILLAMETTE RIVER (Route: 0)
Num:22258 000 00000x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stayed girder [14]
Approach Span(s): Prestressed concrete continuous [6] Girder and floorbeam system [03]
Deck: Open Grating [3] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 524.3 m = 1720.2 ft
Main Spans: 3 at 237.7 m = 779.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 12.7 m = 41.7 ft (2 Lanes) and Out-To-Out: 23 m = 75.5 ft for a 12.7 m = 41.7 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 23.6 m = 77.4 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by Other Local Agencies [25], DOT District: 2
WILLAMETTE RIVER MP 13.2
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 80 metric ton = 88.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 61.9 metric ton = 68.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 630 (2020) and Trucks: 0%
Future ADT: 695 (In 2025 )
I-5 (HWY 001) SB over MARQUAM RAMP SB (Route: 5)
Num:08591C001 30010x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 578.6 m = 1898.4 ft
Main Spans: 14 at 57.8 m = 189.6 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 4.88 m = 16.0 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
WEST MARQUAM INTERCHANGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 12.3 metric ton = 13.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 9.4 metric ton = 10.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 69900 (2018) and Trucks: 9%
Future ADT: 76850 (In 2038 )
I-5 (HWY 001) SB over MARQUAM BRIDGE RAMP (Route: 5)
Num:08590C001 30069x
Open: no restriction [A]
Built: 1966, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 718.7 m = 2358.1 ft
Main Spans: 13 at 54 m = 177.2 ft
Approach Spans: 9
Skew: 0
Width, Roadway: 17.4 m = 57.1 ft (3 Lanes) and Out-To-Out: 18.9 m = 62.0 ft for a 17.4 m = 57.1 ft approaching roadway.
Vertical Clearance: 4.7 m = 15.4 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.8 MI S OF BURNSIDE BR
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 16.5 metric ton = 18.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 12.6 metric ton = 13.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 41850 (2018) and Trucks: 9%
Future ADT: 52200 (In 2038 )
I-5 (HWY 001) NB over MARQUAM BRIDGE RAMP (Route: 5)
Num:08590D001 30068x
Open: no restriction [A]
Built: 1966, Reconstructed: 1994
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 706.6 m = 2318.4 ft
Main Spans: 13 at 54.4 m = 178.5 ft
Approach Spans: 9
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (3 Lanes) and Out-To-Out: 15.2 m = 49.9 ft for a 17.4 m = 57.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.8 MI S OF BURNSIDE BR
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 14.3 metric ton = 15.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 11 metric ton = 12.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 41850 (2018) and Trucks: 9%
Future ADT: 52200 (In 2038 )
HAWTHORNE BRIDGE over WATER AVE TO THE RIVER (Route: 9366)
Num:02757Fx
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 167.3 m = 548.9 ft
Main Spans: 12 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (4 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 5.18 m = 17.0 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WILLAMETTE RIV MP 13.2
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Inventory: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 27012 (2020) and Trucks: 10%
Future ADT: 27587 (In 2025 )
I-5 (HWY 001) NB over SURFACE STREETS (Route: 5)
Num:08591D001 30012x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 532.9 m = 1748.4 ft
Main Spans: 9 at 54.3 m = 178.2 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 4.88 m = 16.0 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
WEST MARQUAM INTERCHANGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 13 metric ton = 14.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 10 metric ton = 11.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 69900 (2018) and Trucks: 9%
Future ADT: 76850 (In 2038 )
I-5 (HWY 001) CON over CITY STREETS/OMSI (Route: 5)
Num:08590Y001C30068x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 189.6 m = 622.1 ft
Main Spans: 7 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
E. BANK OF WILLAMETTE R.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 27.2 metric ton = 29.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.1 metric ton = 23.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 56100 (2018) and Trucks: 9%
Future ADT: 32300 (In 2030 )
SW Harbor Viaduct over SW Harr: Riv: Harb Sher (Route: 0)
Num:22259 000 00000x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 529.9 m = 1738.6 ft
Main Spans: 9 at 70.7 m = 232.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.3 m = 33.8 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 10.3 m = 33.8 ft approaching roadway.
Vertical Clearance: 5.49 m = 18.0 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by Other Local Agencies [25], DOT District: 2
Approach Tilikum
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 45 metric ton = 49.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34.7 metric ton = 38.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 500 (2015) and Trucks: 0%
Future ADT: 550 (In 2035 )
HAWTHORNE AVE over WILLAMETTE RIVER (Route: 9366)
Num:02757 000000000x
Open: no restriction [A]
Built: 1910, Reconstructed: 1997
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Lift [15]
Approach Span(s): Steel [3] Truss - Thru [10]
Deck: Open Grating [3] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 421.5 m = 1382.9 ft
Main Spans: 1 at 76.5 m = 251.0 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 13.3 m = 43.6 ft (4 Lanes) and Out-To-Out: 22.3 m = 73.2 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 33.5 m = 109.9 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WILLAMETTE RIVER MP 13.2
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: Railroad [8]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 32243 (2020) and Trucks: 10%
Future ADT: 35560 (In 2025 )
HY 61SB TO HY 1NB over W MARQUAM BR RAMPS (Route: 405)
Num:08591A061C00109x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 590.6 m = 1937.8 ft
Main Spans: 12 at 47.4 m = 155.5 ft
Approach Spans: 5
Skew: 99
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
W MARQUAM INTCHGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 12 metric ton = 13.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 9.4 metric ton = 10.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 30500 (2018) and Trucks: 8%
Future ADT: 38246 (In 2030 )
I-405 (HWY 061) over CONN'S 1 & 2 (Route: 405)
Num:08591F061 00048x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 347.5 m = 1140.1 ft
Main Spans: 3 at 56.7 m = 186.0 ft
Approach Spans: 11
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 5.74 m = 18.8 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
W MARQUAM INTERCHANGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 14.9 metric ton = 16.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 45700 (2018) and Trucks: 6%
Future ADT: 51650 (In 2038 )
I-5 (HWY 001) CON over SHERIDAN ST (Route: 405)
Num:08193 061C00052x
Open: no restriction [A]
Built: 1959, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 45.4 m = 149.0 ft
Main Spans: 3 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 25 m = 82.0 ft (3 Lanes) and Out-To-Out: 27.2 m = 89.2 ft for a 25 m = 82.0 ft approaching roadway.
Vertical Clearance: 4.95 m = 16.2 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
W. END OF MARQUAM BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 15.2 metric ton = 16.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 11.7 metric ton = 12.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6600 (2018) and Trucks: 12%
Future ADT: 9000 (In 2030 )
HY 1SB TO HY 61NB over MARQ RAMP TO HWY 61 NB (Route: 5)
Num:08591B001C30046x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 490 m = 1607.7 ft
Main Spans: 11 at 54.4 m = 178.5 ft
Approach Spans: 4
Skew: 99
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 5.64 m = 18.5 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
WEST MARQUAM INTERCHANGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 16.5 metric ton = 18.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 12.6 metric ton = 13.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 25000 (2018) and Trucks: 12%
Future ADT: 32782 (In 2030 )
US 26 (HWY 026) over WILLAMETTE RIVER/OPR (Route: 26)
Num:05054 026 00077x
Open: no restriction [A]
Built: 1926, Reconstructed: 2000
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Concrete continuous [2] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 1113.4 m = 3653.1 ft
Main Spans: 5 at 163.1 m = 535.1 ft
Approach Spans: 29
Skew: 0
Width, Roadway: 13.1 m = 43.0 ft (4 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 39.3 m = 128.9 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
IN SE PORTLAND
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 14.6 metric ton = 16.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 60100 (2018) and Trucks: 2%
Future ADT: 64700 (In 2038 )
MADISON ST over GRAND AV TO WATER AV WB (Route: 9366)
Num:02757B000000000x
Open: no restriction [A]
Built: 1957, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 396.2 m = 1299.9 ft
Main Spans: 20 at 24.1 m = 79.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.2 m = 46.6 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WILAMETTE RV MP13.2
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 26.2 metric ton = 28.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 20.4 metric ton = 22.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16730 (2020) and Trucks: 10%
Future ADT: 18451 (In 2025 )
HY 61SB CONN HY1SB over WATER AVE (Route: 405)
Num:08591E061 00053x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 93 m = 305.1 ft
Main Spans: 1 at 26.4 m = 86.6 ft
Approach Spans: 4
Skew: 4
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 5.79 m = 19.0 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
W. MARQUAM INTERCHANGE
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 21.4 metric ton = 23.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 16.5 metric ton = 18.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 45700 (2018) and Trucks: 6%
Future ADT: 51650 (In 2038 )
HWY 003 NB over HWY 001: HWY 061 & Conns (Route: 43)
Num:08194 003 00009x
Open: no restriction [A]
Built: 1959, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 195.7 m = 642.1 ft
Main Spans: 6 at 22.9 m = 75.1 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
1.5 MI S OF PORTLAND CC
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 24.6 metric ton = 27.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20500 (2018) and Trucks: 1%
Future ADT: 24800 (In 2038 )
HAWTHORNE BR. W.A. over WILLAMETTE RIVER (Route: 9366)
Num:02757D000000000x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 96 m = 315.0 ft
Main Spans: 12 at 17.7 m = 58.1 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 19.5 m = 64.0 ft (4 Lanes) and Out-To-Out: 24.7 m = 81.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 5.56 m = 18.2 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WILLAMETTE RIVER MO 13.2
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 68 metric ton = 74.8 tons (Allowable Stress(AS) [2])
Inventory: 15.4 metric ton = 16.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 32566 (2020) and Trucks: 10%
Future ADT: 35916 (In 2025 )
HWY 3 CONN over HWY 1 SB (Route: 43)
Num:08194R003 00010x
Open: no restriction [A]
Built: 1926, Reconstructed: 1959
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 36 m = 118.1 ft
Main Spans: 2 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.9 m = 22.6 ft (1 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 6.9 m = 22.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.5 MI N OF ROSS ISLAND B
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 38.6 metric ton = 42.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 29.8 metric ton = 32.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 6100 (2018) and Trucks: 1%
Future ADT: 7000 (In 2030 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.