Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 358.8 m = 1177.2 ft
Main Spans: 1 at 111.3 m = 365.2 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 20.2 m = 66.3 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 7.93 m = 26.0 ft and Navigational Clearance: 16 m = 52.5 ft
Location
Unknown [00000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
MULTNOMAH CHANNEL MP 205
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 5463 (2020) and Trucks: 10%
Future ADT: 6008 (In 2025
)