Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 57.3 m = 188.0 ft
Main Spans: 1 at 30.5 m = 100.1 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.4 m = 27.6 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Hood River County [027], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
4.0 MI S SCL HOOD RIVER
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.6 km = 1.6 mi
Traffic
ADT: 8100 (2018) and Trucks: 10%
Future ADT: 8200 (In 2038
)