Bridge Type
Main Span(s): Wood or timber [7] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 40.5 m = 132.9 ft
Main Spans: 6 at 7.2 m = 23.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9 m = 29.5 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Clatsop County [007], Oregon [41]
Owned by State Highway Agency [01], DOT District: 1
015 MI N ARCH CAPE TUNNEL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 34.3 metric ton = 37.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 26.6 metric ton = 29.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 4900 (2018) and Trucks: 12%
Future ADT: 8300 (In 2038
)