Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 74.1 m = 243.1 ft
Main Spans: 6 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.8 m = 15.7 ft (1 Lanes) and Out-To-Out: 6.2 m = 20.3 ft for a 4.6 m = 15.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rainier [60850]: Columbia County [009], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 1
RAINIER OREGON WESTSIDE
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Inventory: 12.7 metric ton = 14.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 732 (2020) and Trucks: 10%
Future ADT: 822 (In 2025
)