Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 9.4 m = 30.8 ft
Main Spans: 1 at 8.8 m = 28.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ely [25820]: Marquette County [103], Michigan [26]
Owned by County Highway Agency [02], DOT District: 1
9 MI SOUTH OF GREENWOOD
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60.6 metric ton = 66.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 31.1 metric ton = 34.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: October 2020 [1020] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.9 km = 1.2 mi
Traffic
ADT: 900 (2001) and Trucks: 0%
Future ADT: 1100 (In 2020
)