Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 15.2 m = 49.9 ft
Main Spans: 1 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 7.6 m = 24.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Wakefield [82800]: Gogebic County [053], Michigan [26]
Owned by County Highway Agency [02], DOT District: 1
SEC 30 WAKEFIELD TWP
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 42.5 metric ton = 46.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 20 km = 12.4 mi
Traffic
ADT: 12 (2006) and Trucks: 0%
Future ADT: 20 (In 2026
)