WEST PORTAGE AVE. over POWER CANAL (Route: 2019)
Num:1679x
Open: no restriction [A]
Built: 1970, Reconstructed: 1988
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 80.8 m = 265.1 ft
Main Spans: 1 at 80.7 m = 264.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 18.7 m = 61.4 ft for a 14.9 m = 48.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Sault Ste. Marie [71740]: Chippewa County [033], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 1
SAULT STE MARIE
Condition
Deck: Very Good [8]
Superstructure: Fair [5]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 74.1 metric ton = 81.5 tons ()
Inventory: 33 metric ton = 36.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7637 (2015) and Trucks: 4%
Future ADT: 13794 (In 2035 )
EASTERDAY AVE over I-75 (Route: 0)
Num:1587x
Open: no restriction [A]
Built: 1962, Reconstructed: 2011
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 70 m = 229.7 ft
Main Spans: 4 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 15.6 m = 51.2 ft for a 10.9 m = 35.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Sault Ste. Marie [71740]: Chippewa County [033], Michigan [26]
Owned by State Highway Agency [01], DOT District: 1
IN SAULT STE MARIE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 76.8 metric ton = 84.5 tons (Load Factor(LF) [1])
Inventory: 46.1 metric ton = 50.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 7774 (2010) and Trucks: 3%
Future ADT: 8551 (In 2025 )
EASTERDAY AVE. over ASHMUN CREEK (Route: 0)
Num:1674x
Open: no restriction [A]
Built: 1994, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.3 m = 24.0 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (2 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Sault Ste. Marie [71740]: Chippewa County [033], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 1
SAULT STE MARIE
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.5 metric ton = 60.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 8347 (1997) and Trucks: 0%
Future ADT: 11690 (In 2017 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.