Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 664.8 m = 2181.2 ft
Main Spans: 49 at 49.1 m = 161.1 ft
Approach Spans: 10
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Tacoma [70000]: Pierce County [053], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 3
Puyallup River Crossing
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 28.1 metric ton = 30.9 tons (Load Factor(LF) [1])
Inventory: 17.2 metric ton = 18.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 0 (2019) and Trucks: 0%
Future ADT: 0 (In 2040
)