Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 368.2 m = 1208.1 ft
Main Spans: 3 at 146.3 m = 480.0 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 18.5 m = 60.7 ft (5 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 5.05 m = 16.6 ft and Navigational Clearance: 14.9 m = 48.9 ft
Location
Unknown [00000]: Douglas County [017], Washington [53]
Owned by State Highway Agency [01], DOT District: 2
0.2 N JCT SR 28
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 26152 (2019) and Trucks: 3%
Future ADT: 32428 (In 2039
)