HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


42ND AVE SO over DUWAMISH RIVER (Route: 1037)
Num:81097000000000x
Posted for load [P]
Built: 1949, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 86.6 m = 284.1 ft
Main Spans: 1 at 67.1 m = 220.2 ft
Approach Spans: 2
Skew: 38
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 4.57 m = 15.0 ft and Navigational Clearance: 0 = N/A
Location
Tukwila [72625]: King County [033], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.04 MI E OF SR-599
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: M 18 / H 20 [4]
Operating: 21.1 metric ton = 23.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 12.6 metric ton = 13.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 10300 (2018) and Trucks: 30%
Future ADT: 12000 (In 2038 )
SR 599 over 42ND AVE S / MACADAM RD (Route: 599)
Num:0008103A0000000x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 71.3 m = 233.9 ft
Main Spans: 3 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 47
Width, Roadway: 11.1 m = 36.4 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
0.6 N JCT I-5
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 24924 (2019) and Trucks: 12%
Future ADT: 35192 (In 2039 )
SR 599 over 42ND AVE S (Route: 599)
Num:0008103B0000000x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 67.1 m = 220.2 ft
Main Spans: 3 at 30.5 m = 100.1 ft
Approach Spans: 0
Skew: 48
Width, Roadway: 11.1 m = 36.4 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
0.6 N JCT I-5
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 58 metric ton = 63.8 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2018 [0518] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 24924 (2019) and Trucks: 12%
Future ADT: 35192 (In 2039 )
MACADAM ROAD S. over S 133RD (Route: 1037)
Num:86742000000000x
Open: no restriction [A]
Built: 1997, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 19.5 m = 64.0 ft
Main Spans: 1 at 18.9 m = 62.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.1 m = 39.7 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Tukwila [72625]: King County [033], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.3 S JCT SR599
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 62.6 metric ton = 68.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3600 (2019) and Trucks: 7%
Future ADT: 4000 (In 2039 )
E MARGINAL WAY over SR 599 (Route: 0)
Num:0008103C0000000x
Open: no restriction [A]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 73.2 m = 240.2 ft
Main Spans: 4 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 22
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11.6 m = 38.1 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
1.4 N JCT I-5
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5600 (2002) and Trucks: 7%
Future ADT: 9789 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.