W NORTH BEND WAY over S FORK SNOQUALMIE RIVER (Route: 875)
Num:85731000000000x
Posted for load [P]
Built: 1941, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 142.3 m = 466.9 ft
Main Spans: 4 at 24.4 m = 80.1 ft
Approach Spans: 5
Skew: 99
Width, Roadway: 15.8 m = 51.8 ft (3 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
North Bend [49485]: King County [033], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 1
3.2 MI E OF I-90
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 14.9 metric ton = 16.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 11.3 metric ton = 12.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6500 (2020) and Trucks: 5%
Future ADT: 9000 (In 2040 )
W NORTH BEND WAY over RIBARY CREEK (Route: 875)
Num:85729000000000x
Open: no restriction [A]
Built: 1941, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 49.7 m = 163.1 ft
Main Spans: 8 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (3 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
North Bend [49485]: King County [033], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 1
3.1 MI E OF I-90
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Inventory: 23.6 metric ton = 26.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6500 (2020) and Trucks: 5%
Future ADT: 9000 (In 2040 )
NW 8TH ST over RIBARY CREEK (Route: 875)
Num:87566000000000x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.1 m = 88.9 ft
Main Spans: 1 at 26.2 m = 86.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Northbend [49520]: King County [033], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 1
0.2 MI W OF SR-202
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 41.7 metric ton = 45.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 32.7 metric ton = 36.0 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 700 (2019) and Trucks: 1%
Future ADT: 900 (In 2039 )
SR 202 over OVERFLOW CHANNEL (Route: 202)
Num:0000857A0000000x
Posted for load [P]
Built: 1925, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 4 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
7.5 E JCT SR 203
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 26.9 metric ton = 29.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 20.7 metric ton = 22.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 11579 (2019) and Trucks: 7%
Future ADT: 16349 (In 2039 )
SR 202 over S FK SNOQUALMIE R (Route: 202)
Num:0002251A0000000x
Open: no restriction [A]
Built: 1936, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 138.1 m = 453.1 ft
Main Spans: 1 at 29 m = 95.1 ft
Approach Spans: 16
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 9 m = 29.5 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
7.7 E JCT SR 203
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 11579 (2019) and Trucks: 7%
Future ADT: 16349 (In 2039 )
SR 202 over S FK SNOQUALMIE RIVER (Route: 202)
Num:0010270A0000000x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 33.5 m = 109.9 ft
Main Spans: 1 at 33.5 m = 109.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 17.4 m = 57.1 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
8.3 E JCT SR 203
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 66.2 metric ton = 72.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 2.9 km = 1.8 mi
Traffic
ADT: 15751 (2019) and Trucks: 7%
Future ADT: 22240 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.