Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Concrete [1] Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 63.1 m = 207.0 ft
Main Spans: 24 at 7.6 m = 24.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 4.88 m = 16.0 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
W END MARION STREET
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 43.1 metric ton = 47.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 36 metric ton = 39.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 12000 (2010) and Trucks: 1%
Future ADT: 12254 (In 2034
)