Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 37.8 m = 124.0 ft
Main Spans: 1 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 5.9 m = 19.4 ft (2 Lanes) and Out-To-Out: 6.7 m = 22.0 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Entiat [22010]: Chelan County [007], Washington [53]
Owned by County Highway Agency [02], DOT District: 2
04.1W ENTIAT
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 81.6 metric ton = 89.8 tons (Load Factor(LF) [1])
Inventory: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 59 (2018) and Trucks: 7%
Future ADT: 74 (In 2038
)