Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 114.2 m = 374.7 ft
Main Spans: 3 at 42 m = 137.8 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 7.4 m = 24.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Valley County [105], Montana [30]
Owned by County Highway Agency [02], DOT District: 4
N TAMPICO
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 57.8 metric ton = 63.6 tons (Load Factor(LF) [1])
Inventory: 34.7 metric ton = 38.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.9 km = 1.8 mi
Traffic
ADT: 100 (2002) and Trucks: 0%
Future ADT: 100 (In 2025
)