HISTORIC AMERICAN ENGINEERING RECORD
PITTSBURGH & LAKE ERIE RAILROAD, OHIO RIVER BRIDGE
(Beaver Bridge)
HAER No. PA-510
Location: | Spanning Ohio River, west of Beaver River, Beaver, Beaver County, Pennsylvania. |
USGS Quadrangle: | Beaver, Pennsylvania (7.5-minute series). |
UTM Coordinates: | 17/559875/4504710 |
Date of Construction: | March 1908 to May 1910. |
Basis for Dating: | Secondary sources. |
Designers: | A. R. Raymer (Assistant Chief Engineer, Pittsburgh & Lake Erie Railroad); Albert Lucius (consulting engineer, New York); Paul L. Wolfel (Chief Engineer, McClintic-Marshall Construction Co.). |
Fabricator: | McClintic-Marshall Construction Co. (Pittsburgh). |
Builders: | Dravo Contracting Co. (Pittsburgh), substructure; McClintic-Marshall Construction Co. (Pittsburgh), superstructure. |
Present Owner: | CSX Transportation. |
Present Use: | Railroad bridge. |
Structure Types: | Pin-connected cantilever through truss with suspended span; pin-connected subdivided camelback through truss. |
Significance: | The Beaver Bridge is significant for its relatively long and heavy cantilever truss, planned shortly before the Quebec cantilever bridge collapse of 1907. Rather than select a different design, the railroad proceeded, implementing design checks and strict quality control procedures. Despite a conservative overall design, the Beaver Bridge includes a number of innovative structural details. The substructure is also significant for its early use of concrete pier caissons. |
Historian: | Justin M. Spivey, April 2001. |
Project Information: | The Historic American Engineering Record (HAER) conducted the Pennsylvania Historic Railroad Bridges Recording Project during 1999 and 2000, under the direction of Eric N. DeLony, Chief. The project was supported by the Consolidated Rail Corporation (Conrail) and a grant from the Pennsylvania Historical and Museum Commission (PHMC). Justin M. Spivey, HAER engineer, researched and wrote the final reports. Preston M. Thayer, historian, Fredericksburg, Virginia, conducted preliminary research under contract. Jet Lowe, HAER photographer, and Joseph E. B. Elliott, contract photographer, Sellersville, Pennsylvania, produced large-format photographs. |
Description and History
The Pittsburgh & Lake Erie Railroad (P&LE) was incorporated in 1875 by Pittsburgh
investors seeking to compete with other lines serving northeastern Ohio. The railroad never
reached its namesake destination, terminating instead at Youngstown. P&LE historian Harold H.
McLean called it "an essentially local enterprise," noting that major trunk lines were hesitant to
add more tracks into Pittsburgh after the financial panic of 1873.[1]
Another account by Michael
Bezilla, however, states that the New York Central Railroad (NYC) invested heavily in the new
company and acquired a controlling interest by 1889. Nonetheless, P&LE remained a "semi-autonomous subsidiary" until 1979, when NYC successor Conrail dropped the route. P&LE
existed as an independent railroad for just over a decade, although deeply affected by the decline
of Pittsburgh's steel industry.[2
]
CSX Transportation acquired the route in 1991, and presently
operates it as a freight line.
The most outstanding structure on the P&LE main line has always been the Ohio River
crossing, popularly known as the Beaver Bridge. The railroad follows the Ohio River out of
Pittsburgh, traveling on the southwest bank. At Monaca, it crosses the Ohio into the city of
Beaver and continues up the west bank of the Beaver River toward New Castle. P&LE acquired
former Pennsylvania & Ohio Canal right-of-way for most of this route, which must have
simplified grading work.[3]
The bridge across the wide Ohio River, just downstream of its
turbulent confluence with the Beaver River, was probably the greatest challenge of the original
construction campaign. The first structure at this location was a single-track wrought-iron bridge
designed and built in 1878 by the Philadelphia Bridge Works (a firm also known by the surnames
of its proprietors, Joseph H. Cofrode and Francis H. Saylor). The main channel span was a
double-intersection Pratt through truss 442'-9" long between end bearings.[4
]
After adding a second track to its main line, P&LE contracted for new trusses on the
existing piers around 1890. The piers were not wide enough for a two-track superstructure, so
the replacement bridge carried a single gauntlet track. This arrangement did not suffice long into
the twentieth century, as increasing traffic soon justified a four-track main line. P&LE began
designing a new bridge with two pairs of gauntlet tracks, on an alignment 300'-0" upstream from
the old bridge.[5]
The change in location required permission from the U.S. War Department,
which had jurisdiction over navigable waterways. Approval was contingent upon the railroad
providing a 700'-0" clear channel for shipping.[6
]
Taking a slight skew and pier protection into
account, the main span would have to be 769'-0" long. This was beyond the capabilities of any
simple truss design, but within the range of a cantilever, which uses structural continuity over the
piers to distribute loads to adjacent spans called anchor arms (see Figure 1).
![]() |
Figure 1. East elevation of Beaver Bridge. Sketch by author. |
The railroad announced its plan to construct a cantilever bridge in July 1907, news which
was temporarily eclipsed by the infamous Quebec Bridge disaster.[7]
What would have been the
world's longest cantilever span across the St. Lawrence River at Quebec collapsed during
construction on 29 August of that year. The incident not only cast doubt on the Phoenix Bridge
Co.'s engineers and ended the career of consultant Theodore Cooper, who had double-checked
the design, but also raised suspicions about the cantilever form itself. As noted by engineering
historian Henry Petroski, "no other major cantilever bridge would be completed until the
1930s."[8
]
Despite the P&LE bridge's impressive size among its counterparts on the Ohio River,
the proposed 769'-0" main span was less than half of the Quebec Bridge's 1,800'-0". Instead of
abandoning its plan, the railroad proceeded with confidence tempered by strict attention to
details.
After the Canadian government investigated the Quebec disaster and it ceased to be a
news item, the engineering press paid significant attention to progress of the Beaver Bridge
project. Its designers had discarded all previous assumptions, reported Engineering Record,
instead of "simply enlarging a smaller structure and adopting characteristics unsuitable for the
changed conditions."[9]
This may have been intended as a subtle reference to the doomed Quebec
span, the weight of which had been underestimated by 4,000 tons. P&LE's consultants wanted
not only to distance their design from the Quebec disaster, but also to break new ground in bridge
construction. A series of thirteen articles in Engineering Record described innovative features of
the Beaver Bridge's design and erection procedure. Readers learned about the pioneering use of
unreinforced concrete caissons for the tower piers, the design of reusable erection equipment, the
invention of a wedge bearing to prevent "hammering" of the anchor arms, special tapered rivets,
and a novel traveling crane that avoided the "enormous erection stresses" that plagued previous
cantilever bridges.[10
]
The word "Quebec" was not used even once.
In his history of the P&LE, McLean states that the Beaver Bridge is considered the
greatest work of German-born consulting engineer Albert Lucius.[11]
Lucius came to the U.S. in
1865 and, after working for the Phoenix Bridge Co., established his own consulting practice in
New York in 1886. He created the preliminary design, performed stress calculations, and
developed typical details, giving the Beaver Bridge its basic shape. Loath to repeat his former
employer's mistakes in Quebec, his design is simple, conservative, and relatively heavy. Bridge
historian David Plowden emphasizes Lucius's somewhat retarditaire use of eye-bars and pinned
connections to create a statically determinate, and therefore easy to calculate, design.[12
]
To
further protect its reputation, however, P&LE required the superstructure contractor to accept all
responsibility for the final design and submit shop drawings for Lucius's approval. The
successful bidder, Pittsburgh-based McClintic-Marshall Construction Co., designed the
individual members and devised the erection procedure, with Lucius double-checking their
work.[13
]
Paul L. Wolfel, Chief Engineer for McClintic-Marshall, and his staff therefore deserve a
share of the credit. A number of outstanding details reported in Engineering Record—such as
custom-built erection equipment and "remarkably accessible" rivets in splice connections—
were in fact outside Lucius's scope of work.[14
]
The Beaver Bridge's significance lies not only in the length and weight of the cantilever truss, but also in P&LE's decision to proceed with construction after the Quebec disaster. Despite a conservative overall design, the bridge includes a number of innovative structural details devised by Lucius and Wolfel. Through strict specifications, design checks, and materials testing, P&LE Assistant Chief Engineer A. R. Raymer maintained quality control and ensured the project's success.
Notes
Acknowledgment
The author is grateful to Ronald A. Baraff, Archivist for Steel Industry Heritage Corp., Homestead, Pa., for responding to a preliminary survey form.
Additional Sources