Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 3 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (6 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 23.9 m = 78.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Melbourne [43975]: Brevard County [009], Florida [12]
Owned by State Highway Agency [01], DOT District: 5
0.2 Miles East of US-1
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 48.2 metric ton = 53.0 tons (Load Factor(LF) [1])
Inventory: 28.8 metric ton = 31.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 38000 (2019) and Trucks: 6%
Future ADT: 65930 (In 2041
)