HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


IMMANUEL RD over GILLELAND CREEK (Route: 210)
Num:142270G00180001x
Open: no restriction [A]
Built: 1979, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 3 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pflugerville [57176]: Travis County [453], Texas [48]
Owned by County Highway Agency [02], DOT District: 14
0.2 MI S OF PECAN ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5100 (2010) and Trucks: 5%
Future ADT: 6500 (In 2027 )
DESSAU RD over GILLELAND CREEK (Route: 0)
Num:142270G00190001x
Open: no restriction [A]
Built: 1999, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 71.9 m = 235.9 ft
Main Spans: 4 at 18 m = 59.1 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 19.8 m = 65.0 ft (5 Lanes) and Out-To-Out: 25 m = 82.0 ft for a 19.8 m = 65.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pflugerville [57176]: Travis County [453], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 14
0.01 MI S OF FM 1825
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 21960 (2010) and Trucks: 0%
Future ADT: 28548 (In 2027 )
FM 1825 over GILLELAND CREEK (Route: 1825)
Num:142270190201002x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 47.2 m = 154.9 ft
Main Spans: 2 at 25.9 m = 85.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 13.7 m = 44.9 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pflugerville [57176]: Travis County [453], Texas [48]
Owned by State Highway Agency [01], DOT District: 14
0.10 MI W OF FM 685
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.3 km = 1.4 mi
Traffic
ADT: 20499 (2019) and Trucks: 5%
Future ADT: 40160 (In 2033 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider