HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


SR 0070 over 0088: 0906: 2 R/R: MON (Route: 70)
Num:34533x
Open: no restriction [A]
Built: 1951, Reconstructed: 1993
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Thru [10]
Approach Span(s): Steel continuous [4] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 629.7 m = 2066.0 ft
Main Spans: 3 at 137.2 m = 450.2 ft
Approach Spans: 9
Skew: 8
Width, Roadway: 16.2 m = 53.2 ft (4 Lanes) and Out-To-Out: 17.4 m = 57.1 ft for a 22.9 m = 75.1 ft approaching roadway.
Vertical Clearance: 5.66 m = 18.6 ft and Navigational Clearance: 124.1 m = 407.2 ft
Location
Speers [72736]: Washington County [125], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 12
BELLE VERNON BRIDGE
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 3.7 km = 2.3 mi
Traffic
ADT: 41640 (2021) and Trucks: 28%
Future ADT: 49812 (In 2032 )
SR 0906 over ABAN. R/R (Route: 906)
Num:36276x
Open: no restriction [A]
Built: 1952, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 16.5 m = 54.1 ft
Main Spans: 1 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 19.3 m = 63.3 ft (4 Lanes) and Out-To-Out: 25.5 m = 83.7 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rostraver [66376]: Westmoreland County [129], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 12
ROSTRAVER TOWNSHIP
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 4.8 km = 3.0 mi
Traffic
ADT: 8204 (2021) and Trucks: 5%
Future ADT: 8529 (In 2032 )
SR 0906 over SPEERS RUN (Route: 906)
Num:16705x
Open: no restriction [A]
Built: 1949, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 6.1 m = 20.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (4 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Belle Vernon [05288]: Fayette County [051], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 12
BELLE VERNON BOROUGH
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 18 / H 20 [4]
Operating: 99.9 metric ton = 109.9 tons (Allowable Stress(AS) [2])
Inventory: 99.8 metric ton = 109.8 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Basically intolerable requiring high priority of corrrective action [3] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 1999 [199] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 4065 (2020) and Trucks: 11%
Future ADT: 7136 (In 2032 )
SR 8014 over SPEERS RUN (Route: 0)
Num:37041x
Open: no restriction [A]
Built: 1949, Reconstructed: 1992
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 8.5 m = 27.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
North Belle Vernon [54776]: Westmoreland County [129], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 12
NORTH BELLE VERNON BORO.
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 49 metric ton = 53.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 1999 [199] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 3817 (2021) and Trucks: 7%
Future ADT: 5516 (In 2032 )
ARENTZEN BLVD over WHEELING/LAKE ERIE RR (Route: 0)
Num:35390x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 46.9 m = 153.9 ft
Main Spans: 3 at 19.5 m = 64.0 ft
Approach Spans: 0
Skew: 39
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Speers [72736]: Washington County [125], Pennsylvania [42]
Owned by City or Municipal Highway Agency [04], DOT District: 12
800' NORTH OF SR 2027
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63.5 metric ton = 69.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 350 (2002) and Trucks: 4%
Future ADT: 500 (In 2010 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider