HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


Williamsburg Bridg over FDR DRIVE SB: BARUCH DRI (Route: 0)
Num:2240039x
Open: no restriction [A]
Built: 1903, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Suspension [13]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Closed Grating [4] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 2033 m = 6670.3 ft
Main Spans: 9 at 487.6 m = 1599.8 ft
Approach Spans: 44
Skew: 2
Width, Roadway: 23.3 m = 76.4 ft (8 Lanes) and Out-To-Out: 35.7 m = 117.1 ft for a 29.9 m = 98.1 ft approaching roadway.
Vertical Clearance: 4.11 m = 13.5 ft and Navigational Clearance: 41.1 m = 134.8 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
WILLIAMSBURG BR EAST RVR
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: Other [C]
Operating: 51.6 metric ton = 56.8 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.4 km = 0.2 mi
Traffic
ADT: 85297 (2019) and Trucks: 6%
Future ADT: 105171 (In 2039 )
RTE 907L over RELIEF (Route: 907)
Num:00000000223204Ax
Open: no restriction [A]
Built: 1953, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 90.8 m = 297.9 ft
Main Spans: 4 at 26.5 m = 86.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 7.6 m = 24.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
EAST RIVER PARK
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 64.8 metric ton = 71.3 tons ()
Inventory: 25.2 metric ton = 27.7 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5498 (2017) and Trucks: 3%
Future ADT: 6779 (In 2039 )
HOUSTON STREET over RTE 907L: RTE 907L (Route: 0)
Num:2232040x
Open: no restriction [A]
Built: 2017, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 22.9 m = 75.1 ft
Main Spans: 2 at 11.3 m = 37.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.2 m = 49.9 ft (2 Lanes) and Out-To-Out: 45.4 m = 149.0 ft for a 30.5 m = 100.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
1.6MI NE FDR DR&BKLYN BR
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 80.6 metric ton = 88.7 tons ()
Inventory: 40.8 metric ton = 44.9 tons ()
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 40267 (2001) and Trucks: 5%
Future ADT: 56374 (In 2021 )
RTE 907L over RELIEF (Route: 907)
Num:00000000223204Bx
Open: no restriction [A]
Built: 1953, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 87.2 m = 286.1 ft
Main Spans: 4 at 22.8 m = 74.8 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 7.6 m = 24.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
EAST RVR DRIVE N.B. RAMP
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 61.4 metric ton = 67.5 tons ()
Inventory: 23.9 metric ton = 26.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 12385 (2017) and Trucks: 3%
Future ADT: 15270 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider