HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


RTE 25 over EAST MAIN STREET: FDR DR (Route: 25)
Num:2240048x
Open: no restriction [A]
Built: 1909, Reconstructed: 1989
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Mixed types [20]
Deck: Closed Grating [4] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 1637.1 m = 5371.3 ft
Main Spans: 7 at 192 m = 630.0 ft
Approach Spans: 30
Skew: 20
Width, Roadway: 15.5 m = 50.9 ft (4 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 13.7 m = 44.9 ft approaching roadway.
Vertical Clearance: 3.96 m = 13.0 ft and Navigational Clearance: 41.1 m = 134.8 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
QUEENSBORO BR OVER EAST R
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: Other [C]
Operating: 51.4 metric ton = 56.5 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.9 km = 0.6 mi
Traffic
ADT: 98277 (2010) and Trucks: 8%
Future ADT: 98738 (In 2039 )
RTE 25 over Queensboro Bridge (Route: 25)
Num:00000000224004Gx
Open: no restriction [A]
Built: 1957, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 88.4 m = 290.0 ft
Main Spans: 36 at 2.4 m = 7.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.67 m = 15.3 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: Queens County [081], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
QUEENSBORO BR OVR EAST RV
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Inventory: 28.1 metric ton = 30.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 98277 (2010) and Trucks: 8%
Future ADT: 98738 (In 2039 )
RTE 907L over EAST 61ST STREET: RTE 90 (Route: 907)
Num:2233038x
Open: no restriction [A]
Built: 1941, Reconstructed: 2006
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 483.1 m = 1585.1 ft
Main Spans: 34 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 28
Width, Roadway: 9.9 m = 32.5 ft (3 Lanes) and Out-To-Out: 10.5 m = 34.5 ft for a 9.9 m = 32.5 ft approaching roadway.
Vertical Clearance: 3.75 m = 12.3 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
.2 MI SW JCT FDR DR.&SH25
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 157724 (2018) and Trucks: 1%
Future ADT: 194473 (In 2039 )
E.60thST toFDR NB over RTE 907L (Route: 0)
Num:2233040x
Open: no restriction [A]
Built: 1941, Reconstructed: 2004
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 221.9 m = 728.1 ft
Main Spans: 5 at 17.6 m = 57.7 ft
Approach Spans: 12
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.57 m = 15.0 ft and Navigational Clearance: 0 = N/A
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
NORTH OF QUEENSBORO BR
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design:
Operating: 50.3 metric ton = 55.3 tons ()
Inventory: 13.4 metric ton = 14.7 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 36 (2001) and Trucks: 4%
Future ADT: 50 (In 2021 )
RTE 25 over 21ST STREET: 22ND STREET (Route: 25)
Num:2240047x
Open: no restriction [A]
Built: 1909, Reconstructed: 1985
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Closed Grating [4] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 2057.4 m = 6750.3 ft
Main Spans: 7 at 192 m = 630.0 ft
Approach Spans: 46
Skew: 20
Width, Roadway: 27.7 m = 90.9 ft (5 Lanes) and Out-To-Out: 28.3 m = 92.9 ft for a 27.7 m = 90.9 ft approaching roadway.
Vertical Clearance: 3.4 m = 11.2 ft and Navigational Clearance: 41.1 m = 134.8 ft
Location
New York [51000]: New York County [061], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 0
QUEENSBORO BR OVR EAST RV
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: Other [C]
Operating: 53.7 metric ton = 59.1 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.9 km = 0.6 mi
Traffic
ADT: 123442 (2017) and Trucks: 8%
Future ADT: 124022 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider