HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


RTE 987G over CROTON DAM ROAD: NEW CRO (Route: 987)
Num:5502200x
Open: no restriction [A]
Built: 1972, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 415.4 m = 1362.9 ft
Main Spans: 5 at 121.9 m = 400.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.3 m = 40.4 ft (3 Lanes) and Out-To-Out: 13.8 m = 45.3 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Yorktown [84077]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
TSP(SB) AT NEW CROTON RES
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45 metric ton = 49.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34.7 metric ton = 38.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 0 (2020) and Trucks: 4%
Future ADT: 0 (In 0 )
RTE 987G over RTE 129 (Route: 987)
Num:5502220x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 53.9 m = 176.8 ft
Main Spans: 3 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 41
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 13.9 m = 45.6 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Yorktown [84077]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
JCT TSP&RTE 129
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 97.1 metric ton = 106.8 tons (Load Factor(LF) [1])
Inventory: 58.1 metric ton = 63.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 0 (2020) and Trucks: 4%
Future ADT: 0 (In 0 )
RTE 129 over RTE 987G (Route: 129)
Num:1091440x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 19.5 m = 64.0 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11.2 m = 36.7 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Yorktown [84077]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
JCT RTE 129+TSP NB
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 84.3 metric ton = 92.7 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.9 km = 0.6 mi
Traffic
ADT: 4173 (2015) and Trucks: 5%
Future ADT: 5069 (In 2039 )
RTE 987G over NEW CROTON RESRVR (Route: 987)
Num:5502190x
Open: no restriction [A]
Built: 1931, Reconstructed: 2012
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Arch - Thru [12]
Approach Span(s): Concrete [1] Slab [01]
Deck: Not applicable [N] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 242 m = 794.0 ft
Main Spans: 1 at 228.6 m = 750.0 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 3.96 m = 13.0 ft and Navigational Clearance: 0 = N/A
Location
Yorktown [84077]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
TSP(NB) AT NEW CROTON RES
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.3 metric ton = 85.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 0 (2020) and Trucks: 4%
Future ADT: 0 (In 0 )
RTE 987G over CROTON DAM ROAD (Route: 987)
Num:5502180x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 17.4 m = 57.1 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 16.8 m = 55.1 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Yorktown [84077]: Westchester County [119], New York [36]
Owned by State Highway Agency [01], DOT District: 87
TSP(NB)S OF NEW CROT RES
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 56.3 metric ton = 61.9 tons ()
Inventory: 22.9 metric ton = 25.2 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 0 (2020) and Trucks: 4%
Future ADT: 0 (In 0 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider