HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


HARRISON over FLINT RIVER (Route: 2002)
Num:2844x
Open: no restriction [A]
Built: 1953, Reconstructed: 1983
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 44.5 m = 146.0 ft
Main Spans: 3 at 17.6 m = 57.7 ft
Approach Spans: 1
Skew: 10
Width, Roadway: 13.3 m = 43.6 ft (4 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 70.9 metric ton = 78.0 tons (Allowable Stress(AS) [2])
Inventory: 27.3 metric ton = 30.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6867 (1995) and Trucks: 8%
Future ADT: 12403 (In 2015 )
SAGINAW STREET over FLINT RIVER (Route: 2002)
Num:2849x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 46.9 m = 153.9 ft
Main Spans: 3 at 15.6 m = 51.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.9 m = 58.7 ft (4 Lanes) and Out-To-Out: 24.1 m = 79.1 ft for a 18.2 m = 59.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 97.2 metric ton = 106.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 81.3 metric ton = 89.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14204 (2018) and Trucks: 10%
Future ADT: 17333 (In 2038 )
BEACH GARLAND STS over FLINT RIVER (Route: 2002)
Num:2843x
Open: no restriction [A]
Built: 2007, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 56.7 m = 186.0 ft
Main Spans: 2 at 28.4 m = 93.2 ft
Approach Spans: 0
Skew: 44
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 16.2 m = 53.2 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
1 BLOCK W OF SAGINAW ST
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 69 metric ton = 75.9 tons (Load Factor(LF) [1])
Inventory: 39.2 metric ton = 43.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2929 (2005) and Trucks: 7%
Future ADT: 5284 (In 2025 )
ROBERT T LONGWAY over FLINT RIVER (Route: 2002)
Num:2833x
Open: no restriction [A]
Built: 1994, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 68.6 m = 225.1 ft
Main Spans: 3 at 22.8 m = 74.8 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 18 m = 59.1 ft (4 Lanes) and Out-To-Out: 23.3 m = 76.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN CITY OF FLINT
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.8 metric ton = 47.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 33 metric ton = 36.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 18849 (2001) and Trucks: 8%
Future ADT: 25943 (In 2015 )
KEARSLEY ST over I-475 (Route: 2002)
Num:2669x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 78.8 m = 258.5 ft
Main Spans: 2 at 39.3 m = 128.9 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 23.9 m = 78.4 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 93.6 metric ton = 103.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 56.1 metric ton = 61.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8000 (1988) and Trucks: 0%
Future ADT: 9200 (In 2008 )
SECOND ST over I-475 (Route: 2002)
Num:2668x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 50.3 m = 165.0 ft
Main Spans: 2 at 26.2 m = 86.0 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 16.6 m = 54.5 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.3 metric ton = 77.3 tons (Load Factor(LF) [1])
Inventory: 42.2 metric ton = 46.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 5222 (1997) and Trucks: 3%
Future ADT: 5770 (In 2017 )
GRAND TRAVERSE over FLINT RIVER (Route: 2002)
Num:2841x
Posted for load [P]
Built: 1954, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39.6 m = 129.9 ft
Main Spans: 3 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 23
Width, Roadway: 13.4 m = 44.0 ft (4 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN CITY OF FLINT
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 31.1 metric ton = 34.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 18.5 metric ton = 20.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8359 (2014) and Trucks: 7%
Future ADT: 10200 (In 2034 )
THIRD ST over I-475 (Route: 2002)
Num:2667x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 49.4 m = 162.1 ft
Main Spans: 2 at 24.9 m = 81.7 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13.5 m = 44.3 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 93.6 metric ton = 103.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 56.1 metric ton = 61.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 3379 (1997) and Trucks: 3%
Future ADT: 3733 (In 2017 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider