Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Concrete continuous [2] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 31.4 m = 103.0 ft
Main Spans: 3 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cowlitz [99015]: Cowlitz County [015], Washington [53]
Owned by County Highway Agency [02], DOT District: 4
0.19 N OF SR 4 (MP 47.64)
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Inventory: 20 metric ton = 22.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 700 (2016) and Trucks: 5%
Future ADT: 900 (In 2036
)