Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 75.6 m = 248.0 ft
Main Spans: 5 at 15.1 m = 49.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 10.5 m = 34.5 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Marathon [43000]: Monroe County [087], Florida [12]
Owned by County Highway Agency [02], DOT District: 6
50Ft. E of US-1 MM61
Condition
Deck: Very Good [8]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 43.7 metric ton = 48.1 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 33.3 metric ton = 36.6 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 1609 (2015) and Trucks: 4%
Future ADT: 3032 (In 2037
)