Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 317.6 m = 1042.0 ft
Main Spans: 3 at 68.6 m = 225.1 ft
Approach Spans: 7
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 4.85 m = 15.9 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Colorado County [089], Texas [48]
Owned by State Highway Agency [01], DOT District: 13
0.50 Mi N of US 90
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4820 (2013) and Trucks: 16%
Future ADT: 6750 (In 2033
)