HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


US 67 SB over BRAZOS RIVER (Route: 67)
Num:22130025903046x
Open: no restriction [A]
Built: 1947, Reconstructed: 2008
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Thru [10]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 364.8 m = 1196.9 ft
Main Spans: 3 at 76.2 m = 250.0 ft
Approach Spans: 9
Skew: 0
Width, Roadway: 8.3 m = 27.2 ft (2 Lanes) and Out-To-Out: 8.9 m = 29.2 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 4.88 m = 16.0 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Somervell County [425], Texas [48]
Owned by State Highway Agency [01], DOT District: 2
2.5 MI E OF FM-200
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8519 (2018) and Trucks: 9%
Future ADT: 7730 (In 2036 )
US 67 NB over BRAZOS RIVER (Route: 67)
Num:22130025903085x
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 495.3 m = 1625.1 ft
Main Spans: 13 at 38.1 m = 125.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Somervell County [425], Texas [48]
Owned by State Highway Agency [01], DOT District: 2
2.5 MI E OF FM 200
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8519 (2018) and Trucks: 13%
Future ADT: 4860 (In 2033 )
US 67 over TRIB OF BRAZOS RIVER (Route: 67)
Num:22130025903025x
Open: no restriction [A]
Built: 1941, Reconstructed: 2008
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.4 m = 30.8 ft
Main Spans: 2 at 2.1 m = 6.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 0 m = 0.0 ft (4 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 23.2 m = 76.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Somervell County [425], Texas [48]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI E OF BRAZOS RIVER
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 13.5 / H 15 [2]
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 8519 (2018) and Trucks: 13%
Future ADT: 9720 (In 2033 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.