Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete [1] Arch - Deck [11]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 402 m = 1319.0 ft
Main Spans: 3 at 68.6 m = 225.1 ft
Approach Spans: 13
Skew: 0
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 16.5 m = 54.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fort Worth [27000]: Tarrant County [439], Texas [48]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI N WEATHERFORD ST.
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 62.6 metric ton = 68.9 tons (Load Factor(LF) [1])
Inventory: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 10352 (2019) and Trucks: 10%
Future ADT: 19160 (In 2033
)