HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 7


OGLETHORPE STREET over NS RAILROAD (Route: 3207)
Num:2101770x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 17.7 m = 58.1 ft
Main Spans: 3 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 14
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 17.3 m = 56.8 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by City or Municipal Highway Agency [04], DOT District: 3
0.1 MI E OF SR 74 C MACO
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 36.3 metric ton = 39.9 tons (Allowable Stress(AS) [2])
Inventory: 21.8 metric ton = 24.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 4310 (2011) and Trucks: 1%
Future ADT: 6465 (In 2031 )
I-75 over TOWN CREEK (Route: 75)
Num:2100920x
Open: no restriction [A]
Built: 1967, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7 m = 23.0 ft
Main Spans: 3 at 2.1 m = 6.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (10 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 31.7 m = 104.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN NORTH CENTRAL MACON
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 77750 (2011) and Trucks: 1%
Future ADT: 116625 (In 2031 )
US 41 BUS SBL/SR 1 over I-75 (EXIT 164) @164.02 (Route: 41)
Num:2100170x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 61.6 m = 202.1 ft
Main Spans: 4 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 15.8 m = 51.8 ft (3 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN EAST CENTRAL MACON
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 63.5 metric ton = 69.9 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11610 (2012) and Trucks: 1%
Future ADT: 17415 (In 2032 )
I-75 over CS 367 OGLETHORPE ST (Route: 75)
Num:2100900x
Open: no restriction [A]
Built: 1967, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 42.7 m = 140.1 ft
Main Spans: 3 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 35.6 m = 116.8 ft (7 Lanes) and Out-To-Out: 37.3 m = 122.4 ft for a 30.5 m = 100.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN EAST MACON
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 77750 (2011) and Trucks: 1%
Future ADT: 116625 (In 2031 )
US 41 BUS NBL/SR 1 over I-75 (EXIT 164)@164.12 (Route: 41)
Num:2100160x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 64 m = 210.0 ft
Main Spans: 4 at 18.9 m = 62.0 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 15.8 m = 51.8 ft (3 Lanes) and Out-To-Out: 19.7 m = 64.6 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN EAST CENTRAL MACON
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14780 (2012) and Trucks: 2%
Future ADT: 22170 (In 2032 )
US 41 RAMP over I-75 RAMP TO I-16 EAST (Route: 41)
Num:2150820x
Open: no restriction [A]
Built: 2019, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 112.2 m = 368.1 ft
Main Spans: 6 at 19.5 m = 64.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 8.9 m = 29.2 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN EAST CENTRAL MACON
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 76.2 metric ton = 83.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3450 (2016) and Trucks: 10%
Future ADT: 4050 (In 2036 )
NAPIER AVE. over I-75 @ 163.60 (Route: 3209)
Num:2101760x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 57.9 m = 190.0 ft
Main Spans: 4 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Macon [49000]: Bibb County [021], Georgia [13]
Owned by State Highway Agency [01], DOT District: 3
IN EAST MACON
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 37.2 metric ton = 40.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 1590 (2012) and Trucks: 5%
Future ADT: 2385 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider