Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 97.5 m = 319.9 ft
Main Spans: 5 at 19.5 m = 64.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 21.2 m = 69.6 ft (6 Lanes) and Out-To-Out: 29.7 m = 97.4 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Allen [01924]: Collin County [085], Texas [48]
Owned by City or Municipal Highway Agency [04], DOT District: 18
0.20 MI S OF CHAPPARAL RD
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [A])
Inventory: 32.7 metric ton = 36.0 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 18742 (2019) and Trucks: 0%
Future ADT: 29870 (In 2031
)