I-95 SB over LAKE MARION (Route: 95)
Num:5258x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 1371.6 m = 4500.2 ft
Main Spans: 5 at 42.7 m = 140.1 ft
Approach Spans: 80
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 15.2 m = 49.9 ft
Location
Unknown [00000]: Clarendon County [027], South Carolina [45]
Owned by State Highway Agency [01], DOT District: 7
7MI S OF SUMMERTON
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 34.7 metric ton = 38.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.4 metric ton = 24.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 18300 (2019) and Trucks: 29%
Future ADT: 32025 (In 2039 )
I-95 NB over LAKE MARION (Route: 95)
Num:5249x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 1371.6 m = 4500.2 ft
Main Spans: 5 at 42.7 m = 140.1 ft
Approach Spans: 80
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.7 m = 35.1 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 15.2 m = 49.9 ft
Location
Unknown [00000]: Clarendon County [027], South Carolina [45]
Owned by State Highway Agency [01], DOT District: 7
7MI S OF SUMMERTON
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 34.7 metric ton = 38.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.4 metric ton = 24.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 18300 (2019) and Trucks: 29%
Future ADT: 32025 (In 2039 )