Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 97.5 m = 319.9 ft
Main Spans: 5 at 19.5 m = 64.0 ft
Approach Spans: 0
Skew: 38
Width, Roadway: 40 m = 131.2 ft (8 Lanes) and Out-To-Out: 41 m = 134.5 ft for a 39.3 m = 128.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Atlanta [04000]: Fulton County [121], Georgia [13]
Owned by State Highway Agency [01], DOT District: 7
IN W ATLANTA
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Inventory: 21.8 metric ton = 24.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 135310 (2012) and Trucks: 1%
Future ADT: 202965 (In 2032
)