N110-AV43AV43-N110 over ARROYO SECO (Route: 110)
Num: 53 0985Sx
Open: no restriction [A]
Built: 1940, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.3 m = 60.0 ft
Main Spans: 1 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.5 m = 24.6 ft (2 Lanes) and Out-To-Out: 8.7 m = 28.5 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Los Angeles [44000]: Los Angeles County [037], California [06]
Owned by State Highway Agency [01], DOT District: 7
07-LA-110-27.08-LA
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 23.3 metric ton = 25.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 17.8 metric ton = 19.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Superior to present desirable criteria [9]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5300 (2019) and Trucks: 5%
Future ADT: 5956 (In 2037 )
AVENUE 43 over ARROYO SECO CHANNEL (Route: 0)
Num: 53C1877x
Open: no restriction [A]
Built: 1939, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 24.3 m = 79.7 ft
Main Spans: 1 at 23.1 m = 75.8 ft
Approach Spans: 0
Skew: 36
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 11.9 m = 39.0 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Los Angeles [44000]: Los Angeles County [037], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 7
AT SR 110
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 9 / H 10 [1]
Operating: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 23 metric ton = 25.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4001 (2016) and Trucks: 2%
Future ADT: 10477 (In 2037 )
AVENUE 43 over ST RTE 110 & ARROYO SECO (Route: 0)
Num: 53 0427x
Open: no restriction [A]
Built: 1939, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 59.4 m = 194.9 ft
Main Spans: 3 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 11.9 m = 39.0 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Los Angeles [44000]: Los Angeles County [037], California [06]
Owned by State Highway Agency [01], DOT District: 7
07-LA-110-27.12-LA
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 23 metric ton = 25.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Superior to present desirable criteria [9]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10000 (2019) and Trucks: 1%
Future ADT: 11296 (In 2037 )
FIGUEROA STREET over METRO BLUE LINE (Route: 0)
Num: 53C2156x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.2 m = 30.2 ft
Main Spans: 1 at 8.3 m = 27.2 ft
Approach Spans: 0
Skew: 54
Width, Roadway: 22.8 m = 74.8 ft (5 Lanes) and Out-To-Out: 53.2 m = 174.5 ft for a 22.8 m = 74.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Los Angeles [44000]: Los Angeles County [037], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 7
AT PASADENA AVE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2018 [0518] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21000 (2005) and Trucks: 5%
Future ADT: 26172 (In 2036 )
MARMION WAY over METRO BLUE LINE (Route: 0)
Num: 53C2155x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.2 m = 30.2 ft
Main Spans: 1 at 8.3 m = 27.2 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 9.7 m = 31.8 ft (2 Lanes) and Out-To-Out: 13.2 m = 43.3 ft for a 9.7 m = 31.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Los Angeles [44000]: Los Angeles County [037], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 7
150 FT S/O FIGUEROA ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 54.1 metric ton = 59.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 2018 [0518] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 780 (2005) and Trucks: 2%
Future ADT: 1220 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.