Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 102.4 m = 336.0 ft
Main Spans: 2 at 50.9 m = 167.0 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 15.6 m = 51.2 ft (2 Lanes) and Out-To-Out: 16.2 m = 53.2 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Santa Barbara County [083], California [06]
Owned by State Highway Agency [01], DOT District: 5
05-SB-101-R36.62
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 71.3 metric ton = 78.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 55.1 metric ton = 60.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 4.5 km = 2.8 mi
Traffic
ADT: 16000 (2009) and Trucks: 10%
Future ADT: 29886 (In 2037
)