HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 8


I40-RL over I-40 E.B. / WOLF RIVER (Route: 40)
Num: 79I00400059x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 251.8 m = 826.2 ft
Main Spans: 10 at 24.7 m = 81.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 21.9 m = 71.9 ft (4 Lanes) and Out-To-Out: 22.6 m = 74.2 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
0.2 MI S OF I40-SR300 JCT
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 28.2 metric ton = 31.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 20.7 metric ton = 22.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 119200 (2019) and Trucks: 11%
Future ADT: 190720 (In 2040 )
I40-LL over I-40 W.B. / WOLF RIVER (Route: 40)
Num: 79I00400060x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 228.9 m = 751.0 ft
Main Spans: 11 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 21.9 m = 71.9 ft (4 Lanes) and Out-To-Out: 22.6 m = 74.2 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
0.2 MI S OF I40-SR300 JCT
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 119200 (2019) and Trucks: 11%
Future ADT: 190720 (In 2040 )
I40 EB RP TO SR300 over I40-RL-RP-32D/300-RP-32C (Route: 40)
Num: 79I00400063x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 109.4 m = 358.9 ft
Main Spans: 3 at 41.5 m = 136.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
I40 & SR300 JCT
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 44.1 metric ton = 48.5 tons (Unknown [A])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [A])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 9000 (2021) and Trucks: 11%
Future ADT: 14400 (In 2040 )
FAP 300 EXIT RP over I-40 E.B. (Route: 300)
Num: 79I00400065x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 70.7 m = 232.0 ft
Main Spans: 3 at 38.4 m = 126.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (1 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
SR-300 RAMP / I-40 EBL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 37.3 metric ton = 41.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 28.8 metric ton = 31.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 260 (2021) and Trucks: 13%
Future ADT: 416 (In 2040 )
FAP 300 RP TOI40EB over I-40 W.B. (Route: 300)
Num: 79I00400061x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 70.1 m = 230.0 ft
Main Spans: 3 at 38.5 m = 126.3 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 15.5 m = 50.9 ft (3 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 5.03 m = 16.5 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
IN MEMPHIS
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59.3 metric ton = 65.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 45.7 metric ton = 50.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 23570 (2019) and Trucks: 13%
Future ADT: 37712 (In 2040 )
I40 over I-40 / LEVEE RD (Route: 40)
Num: 79I00400057x
Open: no restriction [A]
Built: 1964, Reconstructed: 1976
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 26.8 m = 87.9 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 32.9 m = 107.9 ft (6 Lanes) and Out-To-Out: 34.7 m = 113.9 ft for a 28 m = 91.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
0.5 MI S OF I40-SR300 JCT
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 32.1 metric ton = 35.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 4.8 km = 3.0 mi
Traffic
ADT: 119200 (2019) and Trucks: 11%
Future ADT: 190720 (In 2040 )
I40 over I40 / LEATH BAYOU (Route: 40)
Num: 79I00400055x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 3 at 4.3 m = 14.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (6 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 33 m = 108.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
06 MI S OF I40-I240 JCT
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54 metric ton = 59.4 tons ()
Inventory: 32.4 metric ton = 35.6 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 4.8 km = 3.0 mi
Traffic
ADT: 119200 (2019) and Trucks: 11%
Future ADT: 190720 (In 2040 )
I40 EX RP TO SR300 over I-40 WB ENT RP (Route: 40)
Num: 79I00400067x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 84.1 m = 275.9 ft
Main Spans: 3 at 30.2 m = 99.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Memphis [48000]: Shelby County [157], Tennessee [47]
Owned by State Highway Agency [01], DOT District: 4
SR-300 JCT.
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 41.5 metric ton = 45.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 32.1 metric ton = 35.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 119200 (2019) and Trucks: 13%
Future ADT: 190720 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider