Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Deck: Concrete Precast Panels [2] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 240.8 m = 790.1 ft
Main Spans: 7 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 10.3 m = 33.8 ft
Location
Harriman [32520]: Roane County [145], Tennessee [47]
Owned by City or Municipal Highway Agency [04], DOT District: 1
IN HARRIMAN - E OF US 27
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Serious [3]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49.5 metric ton = 54.5 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 6970 (2019) and Trucks: 12%
Future ADT: 8784 (In 2039
)