Bridge Type
Main Span(s): Concrete [1] Channel beam [22]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 1 at 8.3 m = 27.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.3 m = 20.7 ft (2 Lanes) and Out-To-Out: 6.9 m = 22.6 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Paoli [57780]: Orange County [117], Indiana [18]
Owned by County Highway Agency [02], DOT District: 6
0.03 W OF 3rd STREET
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Basically intolerable requiring high priority of replacement [2] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 600 (2014) and Trucks: 4%
Future ADT: 780 (In 2034
)