IS 44 W over CST BERRY RD (Route: 44)
Num:1420x
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 51.5 m = 169.0 ft
Main Spans: 4 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 20 m = 65.6 ft (4 Lanes) and Out-To-Out: 20.8 m = 68.2 ft for a 20.1 m = 65.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fenton [23950]: St. Louis County [189], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 5 T 44 N R 6 E
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59.4 metric ton = 65.3 tons (Load Factor(LF) [1])
Inventory: 36 metric ton = 39.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 61474 (2019) and Trucks: 12%
Future ADT: 76842 (In 2039 )
IS 44 E over CST BERRY RD (Route: 44)
Num:1419x
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 51.5 m = 169.0 ft
Main Spans: 4 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 20.3 m = 66.6 ft (4 Lanes) and Out-To-Out: 21.4 m = 70.2 ft for a 20.1 m = 65.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fenton [23950]: St. Louis County [189], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 5 T 44 N R 6 E
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 59.4 metric ton = 65.3 tons (Load Factor(LF) [1])
Inventory: 36 metric ton = 39.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 50807 (2019) and Trucks: 12%
Future ADT: 63508 (In 2039 )
IS 44 E over BR GRAVOIS CR (Route: 44)
Num:1418x
Open: no restriction [A]
Built: 1969, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 11 m = 36.1 ft
Main Spans: 3 at 3.7 m = 12.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (6 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 43.9 m = 144.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fenton [23950]: St. Louis County [189], Missouri [29]
Owned by State Highway Agency [01], DOT District: 5
S 12 T 44 N R 6 E
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 87.3 metric ton = 96.0 tons ()
Inventory: 52.2 metric ton = 57.4 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 102922 (2019) and Trucks: 12%
Future ADT: 128652 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.