Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 56.4 m = 185.0 ft
Main Spans: 1 at 54.9 m = 180.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 9.5 m = 31.2 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
Capon Bridge [13108]: Hampshire County [027], West Virginia [54]
Owned by State Highway Agency [01], DOT District: 5
0.04 MI E OF CR 14 SLS
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Inventory: 20.9 metric ton = 23.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 6200 (2018) and Trucks: 10%
Future ADT: 7750 (In 2038
)