Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.8 m = 32.2 ft
Main Spans: 2 at 4.9 m = 16.1 ft
Approach Spans: 0
Skew: 22
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Oroville [54386]: Butte County [007], California [06]
Owned by City or Municipal Highway Agency [04], DOT District: 3
W OF 14TH ST.
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 40.5 metric ton = 44.6 tons ()
Inventory: 24.3 metric ton = 26.7 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2021 [0321] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5219 (2019) and Trucks: 3%
Future ADT: 7482 (In 2041
)