HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 6


11TH AVE over CHERRY CREEK (Route: 0)
Num:D-01-CC-160x
Open: no restriction [A]
Built: 1925, Reconstructed: 1984
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 26.8 m = 87.9 ft
Main Spans: 2 at 12.1 m = 39.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 19.3 m = 63.3 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Denver [20000]: Denver County [031], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 15
W 11TH AVE AT SPEER BLVD
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8734 (2016) and Trucks: 4%
Future ADT: 10742 (In 2036 )
13TH AVE over CHERRY CREEK (Route: 0)
Num:D-01-CC-150x
Open: no restriction [A]
Built: 1928, Reconstructed: 1987
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 30.4 m = 99.7 ft
Main Spans: 2 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 15.5 m = 50.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Denver [20000]: Denver County [031], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 15
W 13TH AVE AT SPEER BLVD
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 54.2 metric ton = 59.6 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8095 (2016) and Trucks: 6%
Future ADT: 9957 (In 2036 )
N. BANNOCK ST over CHERRY CREEK (Route: 0)
Num:D-01-CC-168x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.1 m = 82.4 ft
Main Spans: 1 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 13.9 m = 45.6 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Denver [20000]: Denver County [031], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 15
BANNOCK ST AT SPEER BLVD
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 75.6 metric ton = 83.2 tons (Load Factor(LF) [1])
Inventory: 34.9 metric ton = 38.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2852 (2016) and Trucks: 4%
Future ADT: 3508 (In 2036 )
8TH AVENUE over CHERRY CREEK (Route: 0)
Num:D-01-CC-170Ax
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.7 m = 90.9 ft
Main Spans: 1 at 26.8 m = 87.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 15.3 m = 50.2 ft (4 Lanes) and Out-To-Out: 21 m = 68.9 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Denver [20000]: Denver County [031], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 15
8TH AVE AT SPEER
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 72.8 metric ton = 80.1 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 22863 (2016) and Trucks: 6%
Future ADT: 28121 (In 2036 )
BANNOCK ST over CHERRY CREEK (Route: 0)
Num:D-01-CC-172x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.5 m = 83.7 ft
Main Spans: 1 at 24.7 m = 81.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 13.8 m = 45.3 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Denver [20000]: Denver County [031], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 15
BANNOCK ST AT SPEER BLVD
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 80.2 metric ton = 88.2 tons (Load Factor(LF) [1])
Inventory: 38.8 metric ton = 42.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3824 (2016) and Trucks: 4%
Future ADT: 4703 (In 2036 )
US 40 ML over CHERRY CREEK (Route: 40)
Num:F-16-TRx
Open: no restriction [A]
Built: 1999, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 31.3 m = 102.7 ft
Main Spans: 1 at 29 m = 95.1 ft
Approach Spans: 0
Skew: 28
Width, Roadway: 29.7 m = 97.4 ft (7 Lanes) and Out-To-Out: 41.3 m = 135.5 ft for a 25 m = 82.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Denver [20000]: Denver County [031], Colorado [08]
Owned by State Highway Agency [01], DOT District: 15
COLFAX / DOWNTOWN DENVER
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.1 metric ton = 76.0 tons (Load Factor(LF) [1])
Inventory: 41.5 metric ton = 45.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 48000 (2018) and Trucks: 4%
Future ADT: 56120 (In 2031 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider