HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


ALTITUDE MILLER RD over SUNFISH CREEK (Route: 0)
Num:5631505x
Bridge closed to all traffic [K]
Built: 1910, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface: Wood or Timber [7]
Bridge Dimensions
Length: 42.1 m = 138.1 ft
Main Spans: 2 at 38.1 m = 125.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.1 m = 20.0 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Adams [00296]: Monroe County [111], Ohio [39]
Owned by County Highway Agency [02], DOT District: 10
10 SOUTH OF JCT CR 29
Condition
Deck: Good [7]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 3.6 metric ton = 4.0 tons ()
Inventory: 2.7 metric ton = 3.0 tons ()
Appraisal
Structural:
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 209 (2015) and Trucks: 7%
Future ADT: 290 (In 2038 )
C29 Sunfish Cr Rd over PINEY FORK (Route: 0)
Num:5631009x
Posted for load [P]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 21.6 m = 70.9 ft
Main Spans: 1 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 6 m = 19.7 ft (2 Lanes) and Out-To-Out: 6 m = 19.7 ft for a 4.6 m = 15.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adams [00296]: Monroe County [111], Ohio [39]
Owned by County Highway Agency [02], DOT District: 10
3.1 MI. E. OF JCT SR 26
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design:
Operating: 16.2 metric ton = 17.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 9.7 metric ton = 10.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 833 (2015) and Trucks: 8%
Future ADT: 1156 (In 2038 )
TWP RD 152 over PINEY FORK (Route: 0)
Num:5634202x
Posted for load [P]
Built: 0, Reconstructed: 2002
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface: Wood or Timber [7]
Bridge Dimensions
Length: 14.9 m = 48.9 ft
Main Spans: 1 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4 m = 13.1 ft (1 Lanes) and Out-To-Out: 4 m = 13.1 ft for a 4.6 m = 15.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Adams [00296]: Monroe County [111], Ohio [39]
Owned by County Highway Agency [02], DOT District: 10
0.2 MI EAST OF JCT CR 29
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 16.2 metric ton = 17.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 9.7 metric ton = 10.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.4 km = 0.9 mi
Traffic
ADT: 209 (2015) and Trucks: 7%
Future ADT: 290 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider